Disaster Recovery Plan Policy
Version1.0.3
Last Updated2024-01-31
APPROVED
1. Overview
AccuCode AI Inc. recognizes the importance of having a robust Disaster Recovery
Plan (DRP) to ensure business continuity and minimize the impact of any disaster
or major outage on our operations. This policy outlines the requirements for
developing, implementing, and maintaining a comprehensive DRP.
2. Purpose
The purpose of this policy is to establish a baseline for creating and
maintaining a DRP that describes the process to recover IT systems,
applications, and data from any type of disaster causing a major outage. The DRP
aims to minimize the impact of disasters on our business operations and protect
the confidentiality, integrity, and availability of our clients’ data.
3. Scope
This policy applies to all IT management staff responsible for developing,
testing, and updating the DRP. The policy focuses on the requirement to have a
DRP and does not provide specific requirements for the content of the plan or
its subplans.
4. Policy
4.1 Contingency Plans
The following contingency plans must be created as part of the DRP:
- Computer Emergency Response Plan: Outlines who to contact, when, and how,
as well as the immediate actions to be taken in the event of certain
occurrences.
- Succession Plan: Describes the flow of responsibility when normal staff is
unavailable to perform their duties.
- Data Study: Details the data stored on the systems, its criticality, and
its confidentiality.
- Criticality of Service List: Lists all the services provided and their
order of importance, explaining the order of recovery in both short-term and
long-term timeframes.
- Data Backup and Restoration Plan: Details which data is backed up, the
media to which it is saved, where that media is stored, and how often the
backup is done. It should also describe how that data can be recovered.
- Equipment Replacement Plan: Describes what equipment is required to begin
providing services, lists the order in which it is necessary, and notes where
to purchase the equipment.
- Mass Media Management: Identifies who is in charge of giving information
to the mass media and provides guidelines on what data is appropriate to be
provided.
4.2 Backup Security and Ransomware Prevention
All client data backups must be encrypted with the same strong, client-specific
encryption used for data at rest. Backups should be retained for 180 days and
securely destroyed thereafter. To protect against ransomware, AccuCode AI Inc.
employs:
- Regular backups isolated from the main network and inaccessible to
unauthorized users
- Immutable backups that cannot be altered or deleted once written
- Strict access controls and network segmentation to contain potential attacks
- Continuous monitoring for suspicious activity and prompt incident response
- Disaster Recovery and Business Continuity plans to ensure data availability
and integrity
4.3 Testing and Updating the DRP
After creating the plans, it is important to practice them to the extent
possible. Management should set aside time to test the implementation of the
DRP. Table-top exercises should be conducted annually to discover and correct
issues that may cause the plan to fail in an environment with few consequences.
The DRP should be reviewed and updated on an annual basis at a minimum.
5. Policy Compliance
5.1 Compliance Measurement
The InfoSec team will verify compliance to this policy through various methods,
including but not limited to, periodic walk-throughs, video monitoring, business
tool reports, internal and external audits, and feedback to the policy owner.
5.2 Exceptions
Any exception to the policy must be approved by the InfoSec team in advance.
5.3 Non-Compliance
An employee found to have violated this policy may be subject to disciplinary
action, up to and including termination of employment.